. [74] The City & Southwest extension represents the first phase of the "southern sector conversion" envisaged in Sydney's Rail Future. The proposal was first made on 11 April 2002 when Col Gellatly, the state's top civil servant and director-general of the Department of Premier convened a meeting of Treasury secretary, John Pierce, the Transport NSW director-general, Michael Deegan, and the State Rail Authority chief executive, Howard Lacy. Major commercial and residential developments are planned around several stations, including a new town centre at Sydney Olympic Park. Planning approval has been received for new precincts to transform communities along the new 24km line connecting Westmead to the Sydney CBD. [16] Expected to cost $12 billion, it would have linked Rouse Hill in Sydney's northwest with the CBD, with construction starting in 2010 and finishing in 2017. [5], The first major works that were contracted for the project by the state government were large tunnelling contracts, divided into three separate sections, with contracts to construct the underground stations and line-wide systems to follow. Moreover, the projected opening for Chapter 4 would be Lionsgate's biggest debut since the pandemic began. The project is now in the second phase, Sydney Metro City and Southwest. [5] The line will form part of the Sydney Metro network. [20], Planning approval process of the project was done in stages due to the size of the project. Sydney Metro is Australias biggest public transport project. Sydney Metro to open in three weeks Published: 6 May 2019 Released by: The Premier Listen Australia's biggest public transport project, the North West Metro, will open to customers on Sunday 26 May, delivering a turn up and go rail service from Rouse Hill to Chatswood. [47] Under the proposal, the project is proposed to be funded by the private sector, with Fastrail's assets being returned to the NSW Government after 30 years. When Stage 2 of the Sydney Metro is complete, the new, fully automated railway will provide turn-up-and-go metro train services between 31 stations along a 66km railway. [60], In February 2018, dynamic testing on the first of the trainsets began. [41] Underground stations are to be delivered for The Bays, Five Dock, Burwood North, North Strathfield and Westmead as part of a Stations Package West contract, while the remaining stations will be delivered individually as part of integrated station developments. It is planned to comprise nine stations, serviced by underground twin tracks. There will be ultimate capacity for a metro train every two minutes in each direction under the city, a level of service never before seen in Sydney. Customers are at the centre of Sydney Metro, including the 21st century design of new railway stations, interchanges and precincts. [53] In a 6-car configuration, the trains have a seating capacity of 378 people, with a total capacity of 1,100. Not to be confused with: Sydney Metro Greater West. This will include site surveys, investigations and road relocation. In February 2023, as part of the 2023 state election campaign, the government of Dominic Perrottet announced business cases would be produced for a further 100km of extensions for the Sydney Metro network. It will operate as part of Sydney Metro, and likely utilise similar . Details of the services will be clearly signposted at stations and also available at www.transportnsw.info. A new metro station at Westmead one of Australias largest health and education precincts. Sydney Metro has also commenced planning for over and adjacent station development atParramatta,Sydney Olympic Park, Hunter Street (West and East) and Pyrmont. For project enquiries or complaints about construction work: Transport for NSW recognise and celebrate the diversity of Aboriginal peoples and their ongoing cultures and care of Country. Winter Love Island is about to heat up even further - thanks to the Casa Amor arrivals (Picture: ITV) Love Island 's 2023 winter . Construction on Sydney Metro City & Southwest began in mid-2017. [93], A Seven News documentary on the early construction of part of the Sydney Metro aired on the Seven Network on 14 July 2016 titled World's Best Metro. [31], Construction began in 2020 with the line planned to open in 2030. The network operates using 22 6-car Metropolis Stock trains, which are fully automated electric multiple units. Services at the 13 metro stations operate every four minutes in the peak in each direction on Australias first driverless railway. This will ensure the systems, technology and interfaces are ready to go so when the stations and new metro trains are open to the community, customers will be able to enjoy the exciting new Sydney Metro experience. The line would have run from West Ryde in Sydney's northwest to Malabar in the southeast but did not come to fruition. [44] For a $8 return toll on top of the normal fare, trains travelling at 160km/h could carry up to 16,000 commuters an hour to the city in 28 minutes, taking 11 minutes from Parramatta to the city. [50][51], Stage 1 (Metro North West) operates with 6-car trains running on 4-minute headways. [44], The Metro North West Line is currently the only line in the Sydney Metro network, linking Tallawong to Chatswood with 13 stations along a 36km (22mi) distance. As a new railway, Sydney Metro West will work together with the existing T1 Western Line, effectively doubling rail capacity from Parramatta to the CBD and supporting the Greater Sydney Commissions vision for better connections between these two major centres. [90], This line will have a much higher voltage than that of the North West, City & Southwest lines, this time a single-phase alternating current at 50Hz.[6]. continue to test systems and technology associated with operating the line, such as passenger information displays, platform screen doors and internal customer information systems in the metro trains; monitor and fine tune the running of the 24/7 Operations Control Centre, which will now oversee the fully automated operations of the driverless metro trains; work with Sydney Metro, Sydney Trains and Transport for NSW to make final adjustments to the interface between Sydney Metro and other modes of transport across the network, so that the transport system is ready for when the Metro North West Line opens. [92], The South East Sydney Transport Strategy of the New South Wales government envisions a metro line starting from the CBD with stations at Green Square, Randwick, two at Maroubra, Malabar and La Perouse built by 2041, as well as another one from Randwick to Eastlakes and, via the Domestic and International terminals of Sydney Airport, further on to Brighton-Le-Sands and then Kogarah by 2056. WHO ARE WE? In November 2016, Sydney Metro, in particular, the John Holland Group, Dragados and Transport for NSW, were awarded the 2016 NSW Premier's Award for Building Infrastructure for the 15km (9.3mi) twintunnels in Bella Vista and Epping, which are currently the longest tunnels constructed in Australia. Find out more on the Sydney Metro West website. It consists of 23km (14mi) of new track between Rouse Hill and Epping, which includes eight new stations. [22], When the project was first announced, up to 12 stations including Parramatta, Sydney Olympic Park, the Bays Precinct and the Sydney central business district were announced as initial station locations. The NSW Government has committed $6.4 billion over 4 years to the project. take below. [44], In March 2005, the proposal was again brought up,[45] and again in December 2006 by then federal Opposition Leader Kevin Rudd during a visit to Penrith should the Australian Labor Party win the 2007 Federal Election. Sydney Metro West is an underground metro railway that will link the Parramatta and Sydney CBDs, and communities in between. The number of minutes is displayed below. Its replacement was the 9km (5.6mi), $4 billion CBD Metro, a shortened route running from Rozelle in the inner-west and into the CBD through to Central railway station. Works began in The Bays area in November 2020 to prepare for the arrival of tunnel boring machines in 2022. [55] The trains utilise Alstom's trademark Urbalis 400 Grade-of-Automation signalling system that ensures that trains are capable of operating automatically at all times including door closing, obstacle detection and emergencies. [46][47] Before that, for the first few weeks after opening, the line operated once every 5 minutes during the peak hours until it was increased to every 4 minutes. [37] The contract for the Western Tunnelling Package was awarded to Gamuda and Laing O'Rourke joint venture in March 2022 at a cost of $2.16 billion. Sydney's first metro, the Metro North West Line, opened on 26 May 2019. Sydney Metro - Western Sydney Airport Line (formerly Sydney Metro Greater West or North South Rail Link) is a proposed infrastructure project that would link the Western Sydney Airport and Aerotropolis to the rail network. Running every four minutes at peak-times, Sydney Metro is expected to open and begin operations towards the end of May 2019 - eight years after it was first announced. [27], On 30 April 2020, the project's Environmental Impact Statement (EIS) was released to the public for exhibition. Lvl 5, 18-20 Orion Road, Lane Cove West, New South Wales. ROIs Open - Sydney Metro West Partnership Nov 2022 ROIs Close - Sydney Metro West Partnership Jan 2023 Expected Pre-qualification Process Commencement Mar 2024 . [91], The City & Southwest line is being planned to be extended from Bankstown to Glenfield[41] via Liverpool,[91] with a further potential extension to the Aerotropolis via the existing South West Rail link that serves Leppington. [20] A stabling and maintenance facility and a service facility was also proposed to be built at Clyde, adjacent to the Auburn Maintenance Centre, and Silverwater respectively. [25], The CBD Metro was cancelled in early 2010 after the Premier was deposed a few months before in 2009. Sydney Metro is revolutionising how Australias biggest city travels, connecting Sydneys north west, west, south west and greater west to fast, reliable turn-up-and-go metro services with fully accessible stations. The government will use a value capture scheme to help pay for the project. Eight-car trains have a design capacity of 1,539 customers and increasing the running frequency to ultimately 30 trains per hour (2-minute headway) would provide a maximum capacity of 46,170 passengers per hour per direction.[52]. After the addition of the Stage 2 extension to Bankstown, the stations platforms will be configured to allow for future use of 8-car trains and the signalling system designed to allow for 2-minute headways, both of which are planned to be introduced once sufficient patronage demands it. [41] However, previous plans have shown connections between the Northwest line and Western Sydney Airport line potentially occurring at either Schofields (extending both lines), or Tallawong (through extension of the Western Sydney Airport line). [14], In October 2019, the locations of seven stations were announced:[21][25], At the time of announcement, the government was considering further stations at Pyrmont and Rydalmere. Government approval for what was initially known as the North West Rail Link, Sydney's first underground metro, was given in 2013. For that, I say thank you." Meet the Sydney Metro Crows Nest team at Crows Nest Festival 16 Oct 2022 Meet the Sydney Metro Crows Nest team at Crows Nest Festival 16.10.2022 Currently consisting of one line that opened on 26 May 2019, it runs from Tallawong to Chatswood and consists of 13 stations and 36 km (22.4 mi) of twin tracks, mostly underground. The Hurstville conversion would add eight stations and 9km (5.6mi) to the metro network. Sydney Metro uses Opal ticketing and fares are set by the NSW Government. Sydneys first metro, the Metro North West Line, opened on 26 May 2019. Plan ahead at transportnsw.info 1 1 A team of archaeologists have unearthed a convict hut and historical artefacts that date as far back as 1792, during the start of work at Sydney Metro Wests Parramatta Station site. For the former owner of the Sydney light rail and monorail, see. [30] Under this proposal, the North West Rail Link would be built as a single-deck, privately operated metro connecting to a future second harbour crossing. The Sydney CBD, allowing easy access to the existing public transport network and Stages 1 and 2 of Sydney Metro, which is currently under construction. The caretaker period for the NSW Election commenced on 3 March 2023. An extension to Sydenham will open next year, followed by a further extension to Bankstown within 12 months. [15] The coalition government was subsequently re-elected in the election that month. Marrickville Dive Site and Trains Facility South, Claremont Meadows Intermediate Services Facility, Orchard Hills Stabling and Maintenance Facility, City and Southwest planning and compliance, Western Sydney Airport line planning and compliance, https://transportnsw.info/travel-info/ways-to-get-around/metro#/. Sydney Metro is the biggest urban rail project in Australian history, transforming how we get around the nations biggest city. Metro Trains Sydney will run the new metro trains every four minutes at peak times at full operational mode in the North West thats 15 trains an hour each way, with the ability to run even more in the future. An unreleased government document leaked to The Daily Telegraph suggests that such a train would eliminate the need of around 18 million car trips per year, reducing between 34,000 and 45,000 tonnes of greenhouse gas emissions being put into the atmosphere. It is important to note that the Sydney Metro project is a different and separate project to the current Sydney Metro, which was first proposed by the new Liberal government in 2011. Most people used their Opal cards to tap off at Chatswood, Macquarie University and Epping. Stage 2, extending the metro under Sydney Harbour and through the CBD to Bankstown, is expected to open in 2024. A new metro station atPyrmontdelivering major benefits to thePyrmontcommunity and supporting plans to transform thisharboursidesuburb. [17], The construction of the North West Metro was however dependent on the privatisation of the electricity network,[18] and after a change of the state's Premier in late 2008, it was cancelled due to budgetary concerns. Artist's impression of Sydney Olympic Park metro station. Patronage was lower than anticipated due to people staying at home and not taking public transport to school or work during the. There are 13 railway stations between Tallawong and Chatswood and 4,000 new commuter car parking spaces. ", "Please explain: FastRail fumes over rejection", "Please explain: Govt ditched $3.9b 'fast rail', "Transport Administration Amendment Act 2010", "No rail plans for Barangaroo's commuters", "Lack of stations on $20b Sydney Metro West rail line questioned", Sydney Metropolitan Bus Service Contracts, https://en.wikipedia.org/w/index.php?title=Sydney_Metro_West&oldid=1138336053, Use Australian English from September 2019, All Wikipedia articles written in Australian English, Pages with no gauge entered in Infobox rail line, Creative Commons Attribution-ShareAlike License 3.0, a new station that will connect to existing stations either at, an interchange at the western end of the line, connecting with the existing railway stations at either, Acciona and Ferrovial Construction joint venture (AF JV), John Holland, CPB Contractors and Ghella Pty Ltd joint venture (JCG JV), This page was last edited on 9 February 2023, at 03:27. Accordingly, no ministerial press releases or related information issued by the Government from this date will be available on this website. Stage one Sydney Metro Northwest is due to open. For other uses of Metro see: Metro (disambiguation). A trip around the Earth at the equator is 40,000km. The project will extend the Metro North West Line from Chatswood on the North Shore, to Bankstown in the city's south-west via the Sydney central business district. Major events that affected the number of journeys made or how patronage is measured are included as notes. [20] Reception to the plans was mixed, with Opposition leader Barry O'Farrell accusing the Premier of "making it up as he goes along" after costings weren't released until after the press conference,[21] and criticism came from the Greens because the route seemed designed to pass through marginal electoral seats. Transport for NSW recognise and celebrate the diversity of Aboriginal peoples and their ongoing cultures and care of Country. A modification to the planning approval for tunnelling and station excavation between The Bays and the Sydney CBDis currently under assessment. The Sydney Metro West project will support a growing city and deliver world-class metro services to more communities. These include Rozelle, Leichhardt, Silverwater and Rosehill. [14], The idea for a metro resurfaced in late 2007 when discussions about an underground 'Anzac Line' took place within the NSW Government. [53] Stage 5 of the project would further extend the line westward from Olympic Park to Parramatta, planned for completion in 2024. The plan received approving comments by the NSW State Government. [5] Like other Sydney Metro lines, Metro West will be fully automated and run similar rollingstock to the Sydney Metro North West Line, with a stabling and maintenance facility to be built at Clyde. [12] He suggested that some "metro" linesoperationally independent from the existing networkshould be constructed past 2020 due to capacity constraints. Sydney Metro is now open. Students who use the Sydney Metro network to get to and from schools can apply for a free School Opal card. [22] The Government's initial submission to Infrastructure Australia for funding was rejected due to "a lack of integrated planning". [48], On 18 March 2008, the NSW State Government announced SydneyLink, which included plans for the West Metro. [49] Premier Morris Iemma was asked about the Western FastRail proposal, and said that "the proposal on Penrith has got to stack up," and "the work that has been done shows that it does not stack up, for a number of reasons. Stations are confirmed at Westmead, Parramatta, Sydney Olympic Park, North Strathfield, Burwood North, Five Dock, The Bays, Pyrmont and Hunter Street in the Sydney CBD. The 24-kilometre metro line doubling rail capacity between Greater Parramatta and the Sydney CBD, linking new communities to rail services and supporting employment growth and housing supply. In May 2021, the station locations of Pyrmont and Hunter Street were announced.[30]. Sydney Fish Market is highly supportive of this project and it's potential to support our growth as a major economic driver in the area. This new underground railway will connect Greater Parramatta and the Sydney CBD. The final piece in the puzzle to connect Sydney Metro City & Southwest with the existing Metro North West Line has been completed, ahead of testing starting later this year. This once-in-a-century infrastructure investment will transform Sydney for generations to come, doubling rail capacity between the two CBDs, linking new communities to rail services and supporting employment growth and housing supply. The proposal was carried forward to the Sydney Metro project announced by Iemma's successor Nathan Rees in 2009. [39], A third tunnelling contract for tunnelling between The Bays and Hunter Street (Eastern Tunnelling Package) was put out to tender in mid-2021. [10] In March 2018, the government expanded the project scope, including:[5][23][13], Other options for new metro stations include Camellia/Rydalmere, North Burwood/Five Dock, Kings Bay (Five Dock) and Pyrmont. [41][42] This included the following links: Sydney Metro services are operated by Metro Trains Sydney, a joint venture between MTR Corporation, John Holland Group, and UGL Rail, who will operate and maintain the network under a 15-year contract. DATE OF ISSUE REVISION BY APPROVED BY . Western FastRail was being backed by a consortium led by businessman and former union leader Michael Easson, which includes Dutch bank ABN AMRO and Australian construction company Leighton Holdings. [30], Sydney Metro West is a separate line between the Sydney CBD and Westmead. [27] The project's western end serves a similar area to the Parramatta Light Rail, whose stage 1 alignment runs between Westmead and Carlingford. Tracking Code. Position Type. All Sydney Metro infrastructure like the stations, trains and railway tracks are owned by the NSW Government. This means Sydney Trains and inter-city services will be freed up for customers in the citys outer west in areas like Blacktown, Penrith and the Blue Mountains. [49] After Nathan Rees replaced Iemma later that year, the West Metro was incorporated into Rees's Sydney Metro project, announced in 2009. From Sydenham, the existing Bankstown railway line as far as Bankstown railway station will be converted from heavy rail to rapid transit standard. Until 26 May, Sydney Metro and the operator of the Metro North West Line, Metro Trains Sydney (MTS), will run the trains to the schedule which is planned for when the line opens, and will carry out final checks and refinements to the system. In August 2020, the government announced a shortlist of three consortia to deliver the project's first two major tunnelling packages:[34]. For copies of recently issued ministerial press releases or information on the election policies of any political party as they relate to this department/agency or its portfolio area, please go directly to the website of the relevant political party. Work is progressing to extend this line from Chatswood to Bankstown, running under Sydney Harbour and the Sydney Central Business District (CBD) with a scheduled 2024 completion. [5] The Clyde facility would be on the site of Sydney Speedway, which would be demolished, and would be accessed from the main tunnels via the former Carlingford railway line corridor. [13] This was later dismissed by the New South Wales Government as only a "shopping list" of potential projects. Sydney Metro is Australia's first fully automated (driverless) rapid transit system. 06 May 2021 | Infrastructure Melbourne Metro Tunnel's 9km tunnels have moved closer to completion, switching the project's focus on to its five new underground stations.

The Newtown Bee Police Reports, Articles S